Commercial service

Selective removal with the retained site in view.

Plan soft demolition and strip-out work around what stays, known services, access, waste handling and the way the site needs to operate.

Contemporary commercial office interior with exposed ceiling services

What can be included

A defined removal boundary protects the next stage.

Confirm what comes out, what remains, how services are made safe and what information is needed before disturbance.

  • Non-structural partitions only after their status is confirmed.
  • Ceilings, floor finishes, joinery and fixtures within scope.
  • Commercial interior strip-outs and selective removal.
  • Protection of retained surfaces and adjoining areas.
  • Services identified and made safe by appropriate parties.
  • Waste routes, disposal and hazardous materials handled as separate confirmed items.

A controlled process

Define the boundary before removal.

Define the boundary

Identify what is removed, what is retained and the handover condition required.

Prepare the area

Confirm access, isolation, protection, service and material requirements.

Remove and hand over

Sequence the agreed strip-out, waste handling and retained-area protection.

Common questions

Before anything is disturbed.

Unknown structure, live services and suspected hazardous materials must be resolved first.

Does soft demolition include structural work?

Structural removal is not assumed. Any structural element requires confirmation, design and appropriately scoped work.

Who makes building services safe?

Electrical, plumbing, fire and other services must be identified and isolated by appropriate parties as the final scope requires.

What if a suspect material is uncovered?

Stop work in the affected area, do not disturb the material and follow the agreed hazardous-material process.

Planning a strip-out?

Call now or request a quote so the removal boundary and site constraints can be discussed.